Artarmon Sydney wall remvoval knocked out factory brick wall

 

 

<Back to projects

 

 

 

For all wall removal quotes & enquiries please use our contact section

Artarmon factory double brick wall removal  - This wall was taken out so the fork lifts could drive in between the factories easier, with out having to go outside with the pallets in the rain. The new wall opening was made to a size of 4m wide using 2 steel beams to hold up the existing brickwork. Then we placed steel end caps to protect the vertical brickwork ends. Also we installed a steel chequered floor plate in between the two factory floors to make up the un even surface from floor to floor.

This picture is the final product, scroll below for during and after shots

 

 

 

 

 

contact Dan for any enquiries